Customization: | Available |
---|---|
After-sales Service: | on-Site Installation, Commissioning, Technical Sup |
Warranty: | 12 Months |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Crushing Machine is mainly used for breaking SPC, PVC materials, like LVT flooring, SPC flooring, plastic door and windows. Materials no need cut. It can continuous feeding.
Mill Machine is self-developed grinding mill machine, mainly used in the fields of recycling of hard PVC, SPC. This machine has applied strong wind cooling system, which can apparently reduce internal temperature of machine.
Crushing Machine |
|
Machine Model |
RCM1300 |
Power |
90KW |
Moving Blades |
18 pcs Alloy |
Fixed Blades |
4 pcs Alloy |
Inlet Size |
1300MM* 500MM |
Capacity |
2000~3000KG/H |
Mill Machine |
|
Machine Model |
RMM800 |
Power |
90KW |
Moving Blades |
36 pcs Alloy |
Fixed Blades |
20 pcs Alloy |
Fan Power |
11KW |
Productive |
800~1200KG/H, Mesh 20~40 |
Size |
3500*3200*4200MM |
-- Energy saving, high efficient and stable.
-- Three - dimensional structure, small footprint.
-- Easy operation and maintenance and QC checking.
-- Power supply protection system to ensure the equipment safe.
-- Patent design, over 10 years' SPC flooring production experience.
-- Increased dust collection device, effectively reduce dust pollution.
-- Vibrating screen select the unqualified material ,reduces the difficulty of workers' operation.
-- Easy to clean and maintain,blades,screen and hopper can be easy to remove and mount.
OUR ELECTRICAL PARTNERS
OUR CERTIFICATES AND PATENTS
OVERSEAS PROJECT CASES
FULL WORKING PROCESS OF SPC FLOORING
1) 12-months warranty on all Romeroca machine (excluding wear parts).
2) 36-months tracking service, prompt response within 24 hours.
3) Providing factory production process and machine layout design.
4) Providing technical guidance, training and support.
5) Providing timely supply support for spare parts.
6) Other support from raw materials, machines to finished products.